CP1518-BD Common Point Ground, 15’, 10mm Female, 1 meg



$9.51

MRO Essentials

Table Mat Ground Cord

Many In Stock


 A  common point ground cord with a bull dog clip for easy connection to ground in the field.

The CP1518BD ground cord offers the common ground point required by ANSI/ESD S-6.1 and ANSI/ESD-S20.20.  Excellent for providing a temporary ground while in the field because of the Bull Dog Clip that can clamp to many surfaces.  Works best with the FSM2424 Field Service Mat.

  • Common point ground cord best used with a field service kit
  • Bull dog grounding clip for a solid but temporary connection to ground
  • Cord Length: 15ft
  • Snap: 10mm Female Snap
  • Has two banana jacks to ground up to two wrist straps
  •  



       

      CARRIERS:
      MRO Essentials ships via the following companies:

    • UPS
    • FedEx
    • USPS
    • DHL (International Only)
    • LTL Freight: Various Carriers

    • Quick Ship by MRO Essentials

       At MROessentials.com, we are on a mission to delivery quality products to you quickly. That is our value proposition. We offer quick turnaround times for purchase orders and same day shipping.  Place an order after 3:30pm Eastern?   It will ship the next day.

      SHIPPING CHARGES:
      All shipments are FOB FACTORY. Purchaser is therefore responsible for both shipping charges and damage to goods in transit. Note that freight charges are based on weight AND volume. Assembled items take up a greater shipping volume and are typically charged at a higher freight rate than items shipped flat. Purchaser must specify a freight carrier at time the order is placed or MRO Essentials will choose a carrier and prepay shipments. The freight cost of prepay shipments will be added to each invoice unless otherwise specified. NOTE: Request to ship UPS 1st, 2nd, or 3rd day is a method of shipment and does not imply any expediting of order processing by MRO Essentials. For non-UPS shipments, the order will be shipped freight collect or third party billing at purchaser’s option. Purchaser is responsible for and agrees to pay (1) charges disallowed or billed back to MRO Essentials by third parties when purchaser has specified third party billing and (2) charges billed to MRO Essentials for corrections made by the carrier including address corrections. Some carriers may not be available to be used by MRO Essentials. Purchaser will be notified if an alternate carrier is required.

      MULTIPLE SHIPPING POINTS:
      MRO Essentials products are manufactured in various locations. Shipping points may vary and may change without prior notice.

      INSURING YOUR SHIPMENT:
      You are responsible for your shipment once it leaves the F.O.B. point. We recommend that you insure all shipments. It is our policy to insure shipments unless otherwise specified. The buyer is responsible for uninsured lost or damaged shipments.

      Related Products